Each trade on a construction project will have a clean set of drawings, which will be used as their as-built drawings, and on which every deviation from the project drawings must be reflected.

False

Somewhat true

True

As-built drawings record the project exactly as it was built, showing every deviation from the original design. In practice, trades provide drawing sets for their scope and update them to reflect what actually happened on site, so a clean, current set exists that documents locations, dimensions, and conditions. Any change from the project drawings—whether a different wall, routing, or component—must be shown on these drawings to create a reliable record for maintenance, future renovations, and compliance. This is why the statement aligns with standard practice: as-built drawings are intended to mirror reality on site, with deviations properly reflected.

Not applicable

Want more questions?

All options are one-time payments.

$25.99

30 day pass for new members

All the basics to get you started

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 30 day premium pass access
$59.99 $171.99 usd

6 month DELUXE pass (most popular)

Everything with the 30 day premium pass FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • Everything included in the premium pass
  • $171.99 usd value for $59.99! You save $106!
  • + Access to the ultimate digital PDF study guide
  • + 6 months of premium pass access
  • + Priority support
$15.99 $24.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy